| |
| |
|
various
work  |
|
 |
 |
 |
Ferrovie dello
Stato s.p.a. State railway
Hight-speed railway line
Milan-Bologna section
System for crossing the river PO
2002
Temporary steel structures used as supports for
the excavation required to install piers in the river
bed.
Metal scaffolding for supporting the excavation machinery.
Footbridge for accessing the work islands from shore.
Total amount of steel used: 1400 tonnes. |
|
|