industrial buildings
Trieste
Acegas
Waste treatment plant - 1a 2a 3a lines
1998 · 2003

Building extending over several number of levels and case bays, built on top of existing structures.
Turnkey construction.
Total covered surface area: approx. 4000 m2
Total area of wall panels: 10500 m2 installed up to a height of 36 m.
Total amount of steel used: 1000 tonnes.
REALIZATIONS
   
  DNA BIT
  COMPANY PROFILE
  REALIZATIONS