Turin Quincinetto motorway Restoring and consolidation of a bridge over Orco
stream 2001
Composite steel – concrete deck road bridge
with flanked carriageways, each way composed of three
spans with a total length of 153 m.
Cross-section consisting of triple-I-beams with latticed
bracings made by self-protective (weathered) steel.
Assembled and erected from the bottom using crane trucks.
Total amount of steel used: 1,300 tonnes.