bridges and viaducts

Anas · s.s. 41 · Darfo/Edolo
Modernisation project – 4th lot Niardo, Braone, Ceto e Nadro variant
Bridge over Palobbia stream
2003


Boxed type truss made by weathered steel with span of 60 m, with longitudinal bolted webs joint.
Assembled and erected from the bottom using crane trucks and temporary piers in the middle.
Total amount of steel used: 350 tonnes

other realizations
REALIZATIONS
   
  DNA BIT
  COMPANY PROFILE
  REALIZATIONS