City of Monza Double carriageway bridge around curve
2002
Box section road bridge with inclined walls and
composite steel – concrete deck coated with ANAS
painting system (3 layers).
Two-way bridge with a total length of 690 m.
6 bays in various spans ranging from 48 to 66 m.
Preassembled on site and erected by launching system and
subsequent lowering onto final supports.
Total amount of steel used: 2,500 tonnes.