IMG_1263[1]IMG_1239[1]IMG_1238[1]IMG_1237[1]2015-10-20 09.25.132015-10-20 09.22.202015-10-20 09.22.132015-10-20 09.21.32

Biomass Power Plant

Norfolk

Supply of about 550 tons of main steel structures, 70 tons of boiler fastening beams, gratings and teardrop patterns steel sheets for a surface of about 2500 sm, together with about 2200 meters guardrails for Biomass Power Plant. The whole structure has been treated with hot-dip galvanized procedure.


Year of construction: 2015
Weight: 700 t