Works for the structural adjustment of bridge Polcevera, in Class D4 of the steel girder over river at km 4+328 of the line B.Assereto – P.Campasso. Construction of a different route to allow the improvement’s works on the railway’s joint Genova – Sampierdarena.
Partial demolition’s works of the existent steel bridge and construction of a new steel painted structure connected to the old one.
Year of construction: 2015-2016
Weight: 900 t