Centrale termoelettrica a Marghera LevanteCentrale termoelettrica a Marghera LevanteCentrale termoelettrica a Marghera LevanteCentrale termoelettrica a Marghera LevanteCentrale termoelettrica a Marghera LevanteCentrale termoelettrica a Marghera LevanteCentrale termoelettrica a Marghera LevanteCentrale termoelettrica a Marghera LevanteCentrale termoelettrica a Marghera Levante

Refurbishment of the Marghera Levante thermal power plant

Marghera Levante

Supply and installation of:

  • structure, support and panelling of the Turbo gas bridge crane and Turbo steam bridge crane;
  • electrical and control building structure and panelling;
  • Pipe Rack interconnecting structure.
  • Pipe Rack structures and Air support in Take.

Year of construction: 2020-2022
Weight: 3.500 t