Supply and installation of:
- structure, support and panelling of the Turbo gas bridge crane and Turbo steam bridge crane;
- electrical and control building structure and panelling;
- Pipe Rack interconnecting structure.
- Pipe Rack structures and Air support in Take.
Year of construction: 2020-2022
Weight: 3.500 t